Plumbing Takeoff Services. First Plan Free.
Send your plumbing plans and fixture schedules; get fixture counts, domestic water and sanitary/vent pipe LF by size, and valves/drains in Excel within 48 hours.
- Plumbing fixtures counted by schedule tag (WC, LAV, FD, WH, cleanouts).
- Supply, sanitary, storm, and vent pipe linear feet scaled by pipe diameter.
- Valves, backflow preventers, traps, and roof/floor drain counts.
- $100 a plan, or $399 a month for up to 10 plans. First plan free.
How it works
- 1. Upload your plan. PDF or a link to the set. Say what you need counted and when the bid is due.
- 2. We do the takeoff. Every quantity is measured from the drawings and tied to a marked area on the plan.
- 3. Get it back within 48 hours. Excel quantities + marked-up PDF by email. Price it your way and send the bid.
What is in a plumbing takeoff
Every fixture on the plumbing schedule counted and cross-checked against floor plans, plus scaled pipe runs separated by system (CW, HW, SAN, VENT, STORM) and pipe size.
Check risers and underground runs fast
Each system is colour-coded on the marked-up plan PDF so you can review underground, above-slab, and equipment connections before pricing.
Price
| First plan | Free |
| Pay per plan | $100 a plan |
| Monthly | $399 a month, up to 10 plans ($40 a plan) |
| Contract | None. Month to month, stop any time. |
Questions
Do you separate pipe lengths by diameter and system?
Yes. Pipe LF is broken out by system (cold/hot water, sanitary, vent, storm) and pipe size wherever sizes are called out on the P-sheets.
What files do you take?
PDF plan sets are best. We also take image files (PNG, JPG, TIFF). For large sets, paste a Dropbox, Google Drive or plan room link in the form.
How fast do I get it?
Within 48 hours of the plan reaching us. Tell us your bid date in the form.
What do I get back?
An Excel quantity sheet and a marked-up plan PDF, so you can see what was counted where.
How do I check the takeoff?
Every quantity on the sheet points to a marked-up area on the plan. Spot-check any room or roof plane against the drawing before you price it.
What does it cost after the free plan?
$100 a plan, or $399 a month for up to 10 plans. No contract.
Do you price the job for me?
Yes, if you want. By default we do the quantities and you price them; send your material prices, labor rates and markup and we add the pricing.
Is my plan kept private?
Your plans are used only for your takeoff and are never shared. Ask and we delete them.
Ready to stop measuring?
Upload your plan, get your first takeoff freeMore: Construction Takeoff Services · Drywall Takeoff Services · Roofing Takeoff Services · Construction Takeoff Services Cost · Construction Takeoff Example · Concrete Takeoff Services · Painting Takeoff Services · Electrical Takeoff Services · Framing & Lumber Takeoff Services · Masonry & CMU Takeoff Services · Flooring Takeoff Services · Sitework & Earthwork Takeoff Services
Dooza is a brand of Adam Laboratory Inc. · 1111b S Governors Ave Ste 34259, Dover, DE 19904 · odysseus@dooza.org · Privacy · Terms