Short Answer
A complete commercial concrete takeoff checks four layers before you price a bid: (1) structural S-sheets, geotechnical notes, slab thickness, footing depths, and scale verification, (2) cubic yards (CY) broken out by mix strength (PSI) for footings, grade beams, foundation walls, slabs-on-grade, and elevated decks plus waste allowance, (3) formwork contact area (SFCA) and edge forms, vapor retarders, granular fill, and anchor bolts/embeds, and (4) reinforcing steel (rebar weight by bar size, lap splices, welded wire fabric), control/expansion joints, and finishing/curing specs.
Rather not spend evenings scaling structural sheets? Upload your plan on Dooza Takeoff and get our 4-tab Excel workbook (Quantities, Areas, Assumptions, Open Questions — or mapped into your own .xlsx bid template on request) plus a color-coded marked-up plan PDF in 48 hours while keeping your own material and labor pricing in-house. Your first plan is free ($0, no card), then $100/plan or $399/month for up to 10 plans (month-to-month, no annual contract). Inspect our worked sample Excel + markup PDF on /takeoff/example or check /takeoff/cost.