
Commercial Painting Takeoff Checklist for Subs (2026)
A 4-step commercial painting takeoff checklist covering finish schedules and RCP ceiling heights, substrates (drywall vs. CMU vs. exposed deck), HM frames/doors, and coat/primer specs.
AI Employees
Dooza CrewBuild your team of AI employeesPhone callsCrew answers your calls, included in your planDooza for SalesLinkedIn, email outreach & follow-upsBill & Claim FighterPay $0 unless we recover cash (20–30%)By industry
Insurance AgentsPortals, inbox, renewalsTruck DispatchersLoad boards, brokers, billingAccountantsClient documents, statements, deadlinesLaw FirmsIntake, client updates, records, docketsMedical BillingCredentialing, payer rules, denials, feesCustomer SupportTickets, orders, refunds, reviewsProperty ManagersMaintenance, tenants, owners, renewalsOwner-OperatorsInvoices, PODs, detention, IFTADone for you
Custom AI agentsWe build and run an agent for one jobSoftware FactoryCustom software built with AI agentsPricingAboutBlogA 4-step commercial flooring takeoff checklist covering room finish schedules and Div 09 specs, net SF by LVT/carpet tile/VCT/ceramic, cove base and transitions, and slab moisture prep.

A complete commercial flooring takeoff checks four layers before you price a bid: (1) room finish schedules, Division 09 flooring specs, pattern/direction notes, and drawing scale, (2) net square footage separated by finish code (LVT/plank, carpet tile, broadloom roll width, VCT, ceramic/porcelain tile, rubber/epoxy) plus documented waste and attic-stock allowances, (3) linear feet of rubber/vinyl cove base (4″ vs. 6″), stair treads/nosings, and doorway transition strips, and (4) subfloor prep, self-leveling, moisture mitigation, and addenda notes.
Rather not spend evenings cross-checking finish schedules and room boundaries? Upload your plan on Dooza Takeoff and get our 4-tab Excel workbook (Quantities, Areas, Assumptions, Open Questions — or mapped into your own .xlsx bid template on request) plus a color-coded marked-up plan PDF in 48 hours while keeping your own material, adhesive, and crew-rate pricing in-house. Your first plan is free ($0, no card), then $100/plan or $399/month for up to 10 plans (month-to-month, no annual contract). Inspect our worked sample Excel + markup PDF on /takeoff/example or check /takeoff/cost.
CPT-1, LVT-1, CT-1) match the exact room perimeters.| Step | Manual scaling in-house | Dooza Takeoff (/takeoff) |
|---|---|---|
| Quantity & schedule measurement | Evenings spent tracing room perimeters, finish codes, and cove base | 48-hour turnaround with color-coded marked-up plan PDF |
| Output format | Custom spreadsheet built per bid | 4-tab Excel (Quantities, Areas, Assumptions, Open Questions) or mapped into your own .xlsx template |
| Pricing control | In-house | You keep all material, adhesive, prep, and installer-rate pricing in-house |
| Cost | Estimator hours | First plan free ($0, no card); then $100/plan or $399/month for up to 10 plans |
Assumptions and Open Questions and color-coded on the plan PDF.Check four layers before pricing: (1) room finish schedules, Div 09 specs, and scale, (2) net SF separated by product (LVT, carpet tile, broadloom, VCT, ceramic, epoxy) plus waste/attic stock, (3) cove base linear feet, transitions, and stair nosings, and (4) subfloor prep, moisture mitigation, and addenda.
Within 48 hours you receive our default 4-tab Excel workbook (Quantities, Areas, Assumptions, Open Questions) plus a color-coded marked-up plan PDF so you can trace every measurement back to the drawing. On request, we can also map quantities into your existing .xlsx bid template.
Yes. View our worked sample Excel and marked-up plan PDF on /takeoff/example before uploading your own set.
Your first plan is free ($0, no card required). After that, pricing is flat: $100/plan or $399/month for up to 10 plans, month-to-month with no annual contract. See /takeoff/cost for full details.
A lead AI agent plus helper agents that browse the web, write files and ask you before they send or pay. Free: install the app and start.

A 4-step commercial painting takeoff checklist covering finish schedules and RCP ceiling heights, substrates (drywall vs. CMU vs. exposed deck), HM frames/doors, and coat/primer specs.

A 4-step commercial roofing takeoff checklist covering roof scale and slopes, membrane and insulation areas, linear flashing and penetrations, and spec/addenda checks.
Got busywork? Dooza it.
Try Dooza Crew, AI agents that do your busywork: free to use. Want a custom agent built for you instead? A Dooza engineer scopes it on a free 30-minute call and it starts as a refundable pilot. See pricing.
Crew: free to use · Custom agents: refundable pilot, 100% refund within 14 days
Dooza builds AI products and services for small businesses. Custom Dooza agents start with a refundable pilot: 100% refund within 14 days.
Or text +1 (855) 594-6841 to use Dooza Crew directly (no sign-up needed), or get the app. Want it done for you instead? Dooza Managed, $200/month.