DoozaDooza
Menu
Log inText Dooza Crew
Construction Takeoff

Commercial Sitework Takeoff Checklist for Subs (2026)

A 4-step commercial sitework and earthwork takeoff checklist covering C-sheet datum and geotech shrink/swell, clearing and cut/fill CY, utility trenching by depth, and paving/SWPPP.

5 min read
November 20, 2026
Commercial sitework estimator reviewing civil grading contour blueprints beside a scale ruler, spreadsheet, and hard hat

Short Answer

A complete commercial sitework and earthwork takeoff checks four layers before you price a bid: (1) C-series civil grading/utility sheets, geotechnical report (soil shrink/swell factors, rock depth, groundwater), Division 31/32 specs, and horizontal/vertical datum & scale, (2) clearing, demolition, and topsoil stripping SF/CY separated from bulk cut, fill, and net import/export cubic yards (CY) plus building pad over-excavation, (3) utility trenching linear feet (LF), trench depth/width classes, pipe bedding, select backfill, and spoils haul-off, and (4) aggregate subbase/base course (CY/tons), asphalt/concrete paving (SY/SF), curb & gutter (LF), and SWPPP erosion controls (silt fence, inlet protection, construction entrance).

Rather not spend evenings tracing existing vs. proposed contour elevations on C-sheets? Send your civil set to Dooza Takeoff (outsource civil & earthwork takeoffs) and get our 4-tab Excel workbook (Quantities, Areas, Assumptions, Open Questions — or mapped into your own .xlsx bid template on request) plus a color-coded marked-up plan PDF in 48 hours while keeping your own crew rates, haul distances, and dump fees in-house. Your first plan is free ($0, no card), then $100/plan or $399/month for up to 10 plans (month-to-month, no annual contract). Review a worked Excel + markup sample at /takeoff/example or see full pricing at /takeoff/cost.

4-Step Commercial Sitework & Earthwork Takeoff Checklist

  1. Verify C-sheet datum, scale, and geotech report: Cross-check civil grading/drainage plans against the geotechnical boring logs (shrink/swell %, rock/unsuitable soil zones, proof-roll requirements) and Division 31/32 specs before measuring.
  2. Quantify clearing, stripping, and bulk cut/fill (CY): Separate clearing/grubbing (AC/SF) and topsoil stripping depth (CY) from mass cut, structural fill, building pad undercut, and net borrow/haul-off balance.
  3. Measure trenching, bedding, and backfill by depth: Take off storm, sanitary, water, and conduit trench LF broken out by depth bracket (0–5 ft, 5–10 ft, 10+ ft), shoring/trench-box zones, stone bedding, and compacted backfill.
  4. Count paving, curb, and SWPPP erosion controls: Measure aggregate base, heavy-duty vs. light-duty asphalt/concrete paving (SY/SF), curb & gutter (LF), sidewalks, silt fence (LF), stabilized construction entrances, and addenda notes.

Manual Scaling vs. Dooza Takeoff

Option Upfront cost Pricing Turnaround & deliverables
Manual in-house takeoff $0 Your estimator's hours Manual contour/trench scaling and custom bid sheet assembly
Dooza Takeoff $0 (first plan free, no card) $100/plan or $399/mo (up to 10 plans, month-to-month) 48-hour 4-tab Excel (Quantities, Areas, Assumptions, Open Questions) + color-coded markup PDF

Deliverables & Pricing

  • 4-tab Excel workbook: Quantities, Areas, Assumptions, and Open Questions (or mapped directly into your existing .xlsx bid template on request).
  • Color-coded marked-up plan PDF: Every cut/fill zone, trench run, paving area, and SWPPP line traced back to the C-sheet.
  • Flat pricing: First plan free ($0, no card), then $100/plan or $399/month for up to 10 plans, month-to-month with no annual contract. Inspect a live sample on /takeoff/example or check /takeoff/cost.

Frequently Asked Questions

What should be on a commercial sitework and earthwork takeoff checklist?

Check four layers before pricing: (1) C-sheet grading/utility scale, datum, geotech shrink/swell factors, and Div 31/32 specs, (2) clearing, topsoil stripping, bulk cut/fill (CY), and pad over-excavation, (3) utility trenching LF by depth, stone bedding, and backfill, and (4) aggregate base, asphalt/concrete paving, curb & gutter, SWPPP erosion controls, and addenda.

What deliverables do I get from Dooza Takeoff?

Within 48 hours you receive our default 4-tab Excel workbook (Quantities, Areas, Assumptions, Open Questions) plus a color-coded marked-up plan PDF so you can trace every quantity back to the civil sheet. On request, we map quantities into your existing .xlsx bid template.

Can I inspect a real takeoff sample before uploading plans?

Yes. View our worked sample Excel and marked-up plan PDF on /takeoff/example before uploading your own civil set.

How much does Dooza Takeoff cost for sitework and excavation subcontractors?

Your first plan is free ($0, no card required). After that, pricing is flat: $100/plan or $399/month for up to 10 plans, month-to-month with no annual contract. See /takeoff/cost for full details.

Frequently Asked Questions

What should be on a commercial sitework and earthwork takeoff checklist?

Check four layers before pricing: (1) C-sheet grading/utility scale, datum, geotech shrink/swell factors, and Div 31/32 specs, (2) clearing, topsoil stripping, bulk cut/fill (CY), and pad over-excavation, (3) utility trenching LF by depth, stone bedding, and backfill, and (4) aggregate base, asphalt/concrete paving, curb & gutter, SWPPP erosion controls, and addenda.

What deliverables do I get from Dooza Takeoff?

Within 48 hours you receive our default 4-tab Excel workbook (Quantities, Areas, Assumptions, Open Questions) plus a color-coded marked-up plan PDF so you can trace every quantity back to the civil sheet. On request, we map quantities into your existing .xlsx bid template.

Can I inspect a real takeoff sample before uploading plans?

Yes. View our worked sample Excel and marked-up plan PDF on /takeoff/example before uploading your own civil set.

How much does Dooza Takeoff cost for sitework and excavation subcontractors?

Your first plan is free ($0, no card required). After that, pricing is flat: $100/plan or $399/month for up to 10 plans, month-to-month with no annual contract. See /takeoff/cost for full details.

Try Dooza Crew

A lead AI agent plus helper agents that browse the web, write files and ask you before they send or pay. Free: install the app and start.

Related Articles

Beam AI Alternative (2026): Done-For-You Takeoffs Without $8k/Yr Lock-In
Construction Takeoff

Beam AI Alternative (2026): Done-For-You Takeoffs Without $8k/Yr Lock-In

Beam AI locks construction trades into annual software licenses starting around $8,000/year. See how Dooza delivers finished Excel quantities and marked-up plan PDFs in 48 hours with no annual contract.

5 min read
Read
Togal.AI Alternative (2026): Month-to-Month Done-For-You Takeoffs
Construction Takeoff

Togal.AI Alternative (2026): Month-to-Month Done-For-You Takeoffs

Togal.AI charges $299/user/month billed annually ($3,588/year upfront) for DIY takeoff software. See how Dooza delivers finished Excel quantities and marked-up plan PDFs in 48 hours with no annual contract.

5 min read
Read

Got busywork? Dooza it.

Still doing it? The world is Doozaing.

Try Dooza Crew, AI agents that do your busywork: free to use. Want a custom agent built for you instead? A Dooza engineer scopes it on a free 30-minute call and it starts as a refundable pilot. See pricing.

Crew: free to use · Custom agents: refundable pilot, 100% refund within 14 days

Talk to Dooza now

Dooza builds AI products and services for small businesses. Custom Dooza agents start with a refundable pilot: 100% refund within 14 days.

Or text +1 (855) 594-6841 to use Dooza Crew directly (no sign-up needed), or get the app. Want it done for you instead? Dooza Managed, $200/month.